N/NorthPole

PROJECT / 003

Westbank Depot

Lightweight steel-frame fabrication and logistics space.

Location
West London
Year
2026 · In progress
Discipline
Industrial
Delivery
Design & build

The brief

A growing operator needed clear-span fabrication and dispatch space on a constrained urban plot.

Our approach

A repeated portal-frame bay allows early enclosure so internal slabs and services proceed under cover. Heavy lifts are sequenced around live delivery routes.

The result

In progress. The frame is the organising idea: simple, repeatable and quick to enclose.

Scope

  • Ground works and slab
  • Portal steel frame
  • Cladding and roofing
  • Loading dock fit-out

Constraints

  • Tight urban plot
  • Crane radius over live routes
  • Phased handover of dispatch bays
SECTION A–A · ILLUSTRATIVE
Illustrative diagram, not construction documentation.
Material study (placeholder, to be replaced with licensed imagery)
Reference image (placeholder)

Related project

Atlas Workshop →

← Back to work index

Discuss a similar project ↗